Configure your ownConfigure
ARC MODULAR | SITE PATHWAYS

Your Module Is Complete. Your Site Pathway Makes It Operational.

Every Arc Modular building is supplied complete internally. Select how certification, installation, plumbing and electrical will be managed for your site. Use your own qualified team, ask Arc to connect you with suitable delivery partners, or request an Arc-coordinated project pathway.

SITE PATHWAY CONFIGURATOR

Map your site pathway in four steps.

Large, plain-language choices — no technical terms required. Nothing here is a quote, a certification outcome or an approval. This questionnaire is entirely optional: you can price a building and send an enquiry without it.

Step 1 of 4 — Certification Selections save as you go

How will your approvals and certification be managed?

“Customer-managed approvals” means Arc Modular is supplying the agreed product and product information only. It does not mean approvals are unnecessary. Requirements vary depending on the site, intended use, installation method, service connections, local zoning and the applicable Tennessee state and local pathway.

◇ ExpandMovable Studios & Small Structures

A small movable studio may have a simpler pathway in some circumstances. This can depend on its intended use, whether it is permanently fixed to land, its service connections, the duration of placement and the applicable local rules. Arc Modular does not determine whether a project is exempt from approval. Customers must confirm the appropriate pathway for their individual site with the local codes department or a qualified land-use professional.

Who will install your Arc Modular building?

What foundation system will support your building?

Final foundation design, pier type, locations, depths and module connection details are site-specific. These are confirmed through the relevant structural design, geotechnical conditions, installation method and approved project documentation.

How will your completed internal plumbing connect to your site?

Your Arc Modular building includes the agreed internal plumbing. This step identifies the site water and wastewater pathway required after installation.

Water supply

Wastewater

Who will manage the connection?

Arc Modular supplies the agreed internal plumbing within the module. Site water supply, wastewater, stormwater and final connection works must be confirmed for the individual property and completed by appropriately qualified local contractors.

How will your building receive power once installed?

Your Arc Modular building includes the agreed internal electrical installation. Select the site power pathway required to energise the module after installation.

Power supply

Who will manage the connection?

A qualified electrical or solar provider must complete the site connection or energy-system scope. The right solution depends on site location, available network infrastructure, module loads, appliances, heating/cooling requirements and the desired level of energy independence.

SEND IT THROUGH

Request your site pathway review

This sends your details and selected pathway as an inquiry — not a quote or a confirmed price. Arc will follow up from there.

This form can't attach files directly — once your email app opens, attach the file to the message before sending.

Send inquiry

Opens your email app with your details and site pathway selections filled in. Nothing is sent automatically, and full name and email are required before this link activates.

◇ Ready to send

Your email app should now be open.

If it didn't open automatically, email sales@arcgroupusa.com directly with your details and selected pathway below, and don't forget to attach any site plan or drawings.

Arc Modular provides the agreed modular product, information and coordination services described in its proposal. Approval requirements, planning pathways, certification, site works, foundations, trade connections and utility requirements are site- and project-specific. Customers must obtain appropriate independent advice and all required approvals before installation or occupation. Arc's introductions to independent contractors or consultants do not create an employment, partnership or statutory approval relationship unless expressly agreed in writing.