03 / KIT SYSTEMS

The engineered steel kit. A complete structure.

Every member is welded, primed and cut to length off site. On site it bolts together — no cutting, no welding. The same portal-frame concept scales from a small studio to a wide-span home simply by stepping up the steel.

Structural steel
AISC 360
Wind basis
112 mph design speed
Scope
Footings to a complete structure
02 / WHAT WE SUPPLY

Off-site fabrication, engineered to code.

Welded and primed in the factory, engineered to AISC 360, AISI S100 and ASCE 7. Three size tiers cover the full span range, and the scope runs from footings to a complete structure, including internal wall framing, windows, doors and cladding.

  1. Off-site fabrication

    Every frame member welded, primed and cut to length in the factory before it reaches site.

  2. Engineered to code

    AISC 360 hot-rolled steel, AISI S100 cold-formed steel, ASCE 7 structural and wind loads, IRC residential provisions.

  3. Three size tiers

    Perimeter channel size steps up with module width — see the tier table below.

  4. Scope

    Footings through to a complete structure, including internal wall framing, windows, doors and cladding.

  5. Standing-seam cladding

    Concealed-fix vertical standing-seam profile, 10 7/16 in cover, one system for both roof and wall.

03 / COMPONENTS

Base system and primary structure.

ComponentSpec
External perimeter7 / 8 / 9 in channel (ASTM A36), sized to module width
Base subframeCold-formed steel box section, 6 × 2 in × 14 gauge
Post-to-base detail3 × 7 in × 1/2 in baseplate, 3/8 in stiffener, 4× 3/4 in anchor bolts
Portal frames6 or 7 in channel (span-dependent), 35° gable, ASTM A36
Eave beams5 in channel, continuous
Apex connection3 × 7 in × 3/8 in plate, 3/4 in bolts
Purlin / eave connection3/8 in plate, 2× 5/8 in bolts
Welds1/4 in fillet, AWS D1.1
Shop finishPrimed; hot-dip galvanizing optional to ASTM A123
Roof purlins6 in cold-formed C-section @ 19 3/16 in centers
Wall framingCold-formed 2 × 4 in studs @ 23 5/8 in o.c., double stud at openings
Roof & wall claddingStanding seam, 10 7/16 in vertical cover
Structural boltsASTM F3125 Grade A325, 1/2 in min
04 / ERECTION SEQUENCE

Footings to a complete structure.

Every kit goes up in the same order — footings, portal frame, purlins and bracing, then the Enseam cladding. Portals always land at 13′-1½″ max centers.

Isometric line drawing of the Arc building assembling step by step Drawn from the amended general arrangement, sheet 2, following the build-up order of the model: base beams, floor joists and deck, portal posts, rafters and apex, portals at thirteen foot centers, wall studs and girts, purlin cleats and purlins, roof cladding, wall cladding and glazing, then a second module and breezeway. 3500 8in CHANNEL JOISTS + DECK 7in CHANNEL X PL 3/8 in Y M20×60 MHSA PL 1/2 in 4000 STUDS + GIRTS Z 16×50 MHSA ROOF SHEET CLADDING GLAZED GABLE DOOR
Isometric, GA sheet 2Line-work, not to scale on screen

01 / 12

Footings and base beams

The footings are set, then the 8 in channel base beams are bolted down to form the perimeter the whole frame is set out from.

Step 1 of 12

Sequence shown is diagrammatic, single bay at 13′-1½″ portal spacing. From the Structural Kit System supply specification.

Isometric GA drawing of the bolted portal-frame kit, with connection details at the ridge, eaves and base.
Bolted, not welded. No cutting on site.
Exploded isometric of the portal-frame kit with numbered weldments and the parts list.
Delivered as a kit – twelve weldments, bolted together on site.
05 / MODULE TIERS

Same concept, bigger steel.

The portal frame concept is identical across every tier — only the perimeter and portal channel sizes step up with module width.

TierModule widthPerimeter channelPortal channel
T1 · StandardUp to 9′-10″7 in6 in
T2 · Mid9′-10″ – 11′-6″8 in6 or 7 in
T3 · Wide11′-6″ – 14′-9″9 in7 in

Beyond the documented tiers, the kit is also supplied as a 16′-5″ or 19′-8″ clear open span on 12 in channel portals, in lengths from 31′-2″ to 50′-10″. These widths are kit supply only — a finished building wider than 14′-9″ cannot be moved on a road — and the internal layout is drawn with you rather than selected from a plan set, because nothing inside the perimeter is load bearing.

Sourced from the Structural Kit System supply specification, June 2026. The 16′-5″ and 19′-8″ open-span widths sit outside that document and are current Arc supply direction. Module length is variable up to an 26′-3″ standard bay, extended by combining bays; multi-module layouts run side-by-side via a shared central portal or independent frames. Figures presented here are specific to the Kit System supply spec and are separate from the channel width bands quoted on the main Proof section of this site.

06 / ENGINEERING BASIS

Built to code, not to guesswork.

Structural steelAISC 360
Cold-formed steelAISI S100
Structural loadsASCE 7
Wind loadsASCE 7 — 112 mph basic design wind speed
Residential live load40 psf floors / 20 psf roof
Roof dead load3 psf minimum
WeldingAWS D1.1 — 1/4 in continuous fillet
BoltingAISC 360 + ASTM F3125 Grade A325, 1/2 in min
GalvanizingASTM A123, where specified

Member sizes and geometry are the Arc Structural Kit System supply specification, June 2026, relabelled in imperial — the building is physically identical to the Australian system. US code references are the equivalent standards for the same design intent; the governing wind, snow and seismic loads for your site and the stamped calculations are confirmed by the licensed engineer of record in Tennessee before fabrication. Portal spacing is always at 13′-1½″ max.

07 / SCOPE OF SUPPLY

Included. Not included.

Included

  • + Channel perimeter base frame
  • + Cold-formed steel floor subframe
  • + Portal frames with welded cleats
  • + 5 in channel eave beams
  • + C15019 Cee purlins
  • + Cold-formed wall framing
  • + 10 7/16 in Enseam roof and wall cladding
  • + Aluminum windows and doors
  • + All structural connections and hardware
  • + Shop prime coat
  • + Fabrication drawings (IFC set)
  • + Internal fit-out, supplied through Arc Elements

Not included

  • - Concrete pier or footing construction
  • - Internal linings and insulation
  • - Electrical and plumbing rough-in
  • - Crane and erection labor
  • - Building permit documentation
  • - Site preparation and access

Structural Kit System supply specification, June 2026, page 5.